Kannada Tullu Tunne Images Pdfl Link _top_ Jun 2026

Kannada Tullu Tunne Images Pdfl Link _top_ Jun 2026

A single, well‑curated PDF that brings together high‑resolution photographs of from both Kannada‑speaking and Tulu‑speaking regions serves three core purposes:

| Tunnel | Length | Type | Year Completed / Under Construction | Notable Features | |--------|--------|------|-------------------------------------|------------------| | | ~2 km | Highway | Under construction (expected 2027) | First major road tunnel in the Tulu region; includes ventilation and emergency exits. | | Bangalore‑Mysore Railway Tunnel (KRS‑Mys) | 1.34 km | Railway | Completed 2022 | Double‑track, electrified, speeds up passenger trains to 130 km/h. | | **Shivamogga‑Kundapura Tunnel (Western Ghats) ** | 1.8 km | Highway | Feasibility study (2024) | Aims to cut the “Ghat Road” travel time by ~30 minutes. | | Brahmavar‑Mundkur Sea‑Side Tunnel (Proposed) | 3 km (underwater) | Road/Utility | Concept stage | Would link two coastal Tulu towns while preserving fragile mangrove habitats. | kannada tullu tunne images pdfl link